BEVERLY HILLS, CA — For years this city fought a subway it did not want. Then, on May 8, the trains arrived anyway, and the platform filled on the very first morning.
The first stop sits at the edge of town. Wilshire/La Cienega Station opened this spring on the northeast corner of Wilshire and La Cienega.
The second stop is still a staging yard behind a fence. When it opens in Spring 2027, the Beverly Drive Station will put a subway entrance four short blocks from Rodeo Drive.
The station the city already has
Wilshire/La Cienega is a modest building by Beverly Hills standards. A one-story structure hides the escalators, elevators, and stairs that drop to a concourse and a platform below.
It is easy to walk past. It is hard to ignore once you are on it.
The entrance opens onto Restaurant Row. On a warm afternoon, the smell of a grill drifts down La Cienega and through the doors.
Metro built three stations in this first stretch, at La Brea, Fairfax, and La Cienega. Together they cover just under four miles of Wilshire Boulevard.
On a good day, a rider boards downtown and steps off in Beverly Hills without changing trains.
Wilshire/La Cienega Station at a glance
- Opened: May 8, 2026
- Where: northeast corner of Wilshire and La Cienega
- Layout: one-story entrance, upper concourse, lower platform
- Access: escalators, elevators, and stairs
- Nearby: Restaurant Row, the Saban Theatre, Beverly Center
- Art: Todd Gray (entrance), Soo Kim (platform), Mariana Castillo Deball (concourse)
The art was chosen with local input. The city’s Arts and Cultural Commission helped select the artists who shaped the station’s look.
Todd Gray made the entrance piece. Soo Kim’s work sits on the platform, and Mariana Castillo Deball’s fills the concourse.
The station also lands riders beside some old civic fixtures. The Saban Theatre, the Lumiere Cinema, and the Margaret Herrick Library all sit within a few blocks.
Restaurant Row runs along La Cienega, a line of tables that fed this city long before anyone imagined a train beneath it.
Trains run from early morning until late at night. That matters when dinner on La Cienega runs long.
Crowds came in the first weeks for the novelty. By summer, the platform belonged to commuters who had stopped noticing it.
The one still coming
The Beverly Drive Station has been under construction for years. Its entrance will land on the southwest corner of Wilshire and Reeves Drive.
For a long time, project maps called it Wilshire/Rodeo. The final name is plain Beverly Drive.
The Reeves staging yard, where Metro once parked equipment, will become the entrance itself.
The heavy digging is done. Crews finished boring the tunnel from Century City to the station in January 2022. The last stretch along Wilshire wrapped in February 2023.
What remains is the station itself, finished floor by floor.
Section 2 carries the line from La Cienega west through Beverly Hills and on to Century City. That single stretch is the one this city watched for a decade.
An opening date that slips is normal here. Metro has shifted this project’s timeline before, and the city has learned to wait.
Three artists are on the job: Meleko Mokgosi, Rigo 23, and Devon Tsuno.
What the second station changes
The new stop serves the Golden Triangle, the wedge between Wilshire, Santa Monica Boulevard, and Crescent Drive. It holds most of the city’s retail floor space.
The entrance sits within a short walk of the Beverly Wilshire, the SIRTAJ, SIXTY, and AKA. Rodeo Drive is close behind.
The city has spent years reworking the streets above the tunnel. Bus lanes and new signals are already changing how Wilshire moves.
South Beverly Drive, a quieter strip of shops and lunch counters, is just as near.
Someday soon, sneakers will outnumber town cars on that stretch of Wilshire.
Residents who once drove eight blocks to dinner may start walking instead. That is a small shift, and a real one.
Parking here has never been simple. A subway offers a way around it anyway.
| Station | Intersection | Status |
|---|---|---|
| Wilshire/La Cienega | Wilshire & La Cienega | Open since May 8, 2026 |
| Beverly Drive | Wilshire & Reeves Drive | Opening Spring 2027 |
The bill for all this
Section 1 did not arrive on time or on budget. It opened about three years late and roughly $700 million over its original $2.8 billion cost. The tab now stands near $3.51 billion.
The numbers are large even for a city that has grown used to large numbers.
Most of it comes from county sales taxes. Federal money covered the rest, including a $1.25 billion grant.
The hurry has a deadline behind it. Metro wants its biggest projects finished before the 2028 Olympics reach Los Angeles.
Beverly Hills got its train, deadline and all.
What to watch
For riders, the payoff is time. A trip from downtown Los Angeles to Westwood should run about 25 minutes.
The project “will provide a transportation alternative from downtown Los Angeles to Westwood, including two stops in Beverly Hills.”
— City of Beverly Hills
Two more stations are rising farther west, at Westwood and near the VA campus. When they open, the line will finally run the whole corridor.
Then the trip from Beverly Hills to UCLA becomes something you can do without a car.
For residents, the larger question is what the station does to the blocks around it. A turnstile draws foot traffic, and foot traffic changes what opens beside it.
The city keeps a full breakdown on its D Line Project page, with a separate page for the Beverly Drive Station. Metro lists the system and the station art on its own site.
The long fight that preceded all of this is told in Beverly Hills Spent 40 Years Keeping the Subway Out. The changes coming to the street above it are covered in Wilshire Blvd Bus Lanes.
For now, one station hums under Restaurant Row and a second waits behind a fence a mile east. The subway this city spent decades refusing is arriving in pieces.
The first piece is open. The one that reaches the Golden Triangle comes next.